21.01.2012EQUIPMENT FOR AMPHIBIOUS WARFARE SHIPIn 2011, CJSC «BARS» manufactured and delivered 8 diesel fuel separating machines for amphibious warfare ship.
The separating machines were made for purification of fuel that falls in the principal and auxiliary
diesel engines.23.12.2009TORPEDO-BOATIn 2009, «BARS» made in sized mockups of a torpedo boat project «Komsomolets» (it took part in the Great World War II) and of a pilot cabinet of the submarine project «Schuka» (with a part of the external hull) for a historical museum of JSC «Uralelectromed».01.09.2008EMERGENCY RESCUE BUI FOR SUBMARINESIn 2008 CJSC «Bars» manufactured emergency rescue buoys ASB-30 for diesel-driven submarines and ASB-40 — for nuclear-powered submarines, as well as mechanisms for their return.06.02.2008REPAIR OF THE VESSEL «CUENCA»In 1997 the company made a refit of a Greek vessel «Cuenca» because its whole fore body was crushed.13.12.2006COOPERATION WITH JSC «BALTIYSKIY ZAVOD»In 2005-2006, CJSC «BARS» took part in the manufacturing program and made about 3000 tons of icebreaker sections under the supervision of the Russian Maritime Register, and of vessels type RO-RO under the supervision of DNV.01.03.2006COOPERATION WITH JSC «NW SEVERNAYA SHIPYARD»From 2002 to 2005 upon the request of JSC “NW Severnaya Shipyard” the company performed a large amount of works on the fabrication and installation of hull structures, aluminum and nonmagnetic alloy superstructures and pipe systems for torpedo-boat destroyers project 956.01.01.2006PARTICIPATION IN CONSTRUCTION OF CORVETTESSince 2006 CJSC «Bars» is a supplier of serial equipment for vessels in this series.11.08.2005DSM (DIESEL-DRIVEN SUBMARINE) SYSTEMS PROJECT 636 MANUFACTURINGFrom 2003 to 2005, upon the order of FSUE «Admiralty Shipyards», the specialists of the company complied works on the fabrication and installation of piping systems for five export submarines project 636.19.02.2002COMPLETE OVERHAUL OF A TRAVERSING CRANE BELONGING TO THE JSC «SEVERNAYA VERF»In 2001, «BARS» won a tender for complete overhaul of a traversing crane belonging to the JSC «Severnaya Verf»11.12.2001WORKS HELD ON THE «VYBORG SHIPYARD»CJSC «BARS» has been beneficially cooperating with the «Vyborg Shipyard» for 20 years. In 2000-2001, the company performed works on the assembly and welding of the sections of a series of fishing trawlers and semi-submersible drilling rig CS-50.